Turn your water management program into an operational system, not a binder.

Caseore helps teams operationalize healthcare water management by turning monitoring exceptions, corrective actions, and evidence into traceable cases rather than isolated logs and documents.

ASHRAE 188CDC guidanceCMS requirement
Hospital manager illustration

What Caseore manages for water management programs

Most programs exist as documents. Caseore makes them operational.

Control-point registry

Define monitoring locations, control measures, and limit configurations across buildings and campuses. Link each point to water management plan requirements.

Monitoring schedules

Configure recurring checks like temperature readings, disinfectant levels, and sampling events with assignment, due-date tracking, and completion evidence.

Exception cases

When a control point goes out of range, the exception becomes a case, not a note in a binder. Root-cause documentation, corrective actions, and verification stay in one record.

Cross-team coordination

Facilities, infection prevention, safety or compliance, and outside consultants or vendors collaborate in one case thread without email or shared-drive workarounds.

Building and campus views

See open cases, overdue responses, and repeated issues by building, campus, or across the entire organization.

Survey-ready exports

Full case history and evidence trail are available for CMS surveys, Joint Commission reviews, or internal audits, assembled as the work happens.

How a water management exception becomes a closed case

01

Monitoring event logged

Scheduled temperature reading, disinfectant check, or sampling event is completed and recorded in Caseore.

02

Exception detected

Reading falls outside configured control limits, generating an alert and opening a case with linked control point and requirement context.

03

Investigation documented

Root-cause notes, affected areas, and risk assessment are captured in the case record.

04

Corrective action assigned

Tasks are created for facilities, infection prevention, or vendors with documents and communications threaded in the case.

05

Follow-up verification

Re-check or retest confirms that corrective action resolved the exception and verification evidence is attached.

06

Closure with audit trail

Case closes with signoff and a full record of exception, investigation, action, verification, and approval.

Questions we ask in every first conversation

Does your water management program live mostly as a document, or as an actively managed workflow?
When a control point goes out of range, how is the issue documented, assigned, escalated, and verified?
Who owns follow-up when the work crosses facilities, infection prevention, and outside consultants or vendors?
How do you prove that an exception was not only noticed, but resolved and closed?
Can you quickly show all open water-related findings across buildings or sites?
What happens when the person who knows the binder is unavailable?

What we hear and how we respond

We already have a consultant helping with our program.
Caseore is not a replacement for the consultant or the program design. It is the operational record that shows the program is being executed, exceptions are being managed, and evidence is being retained.
We already have a facilities work-order system.
Work orders do not automatically give you a compliance case that links the requirement, the exception, the investigation, the corrective action, the verification, and the final closeout.
This is just Legionella paperwork.
Healthcare water management is an ongoing risk-management process. The difficulty is proving that monitoring exceptions were acted on, verified, and closed consistently.
We only need this for survey time.
That is usually a sign the workflow is not operationalized. A live system reduces the survey-time scramble because the record is already assembled as work happens.

One facility. One building program. 90 days.

Pilot includes control-point registry, monitoring schedule, exception cases, corrective actions, and compliance exports for one facility or building.

Scope
1 facility or building
Timeline
90 days
Focus
Monitoring to closure

What to expect

1

Discovery call

We learn about your program, current workflow, and the specific compliance pain you want to fix.

2

Tailored walkthrough

We show the Caseore workflow that fits your environment instead of a generic feature tour.

3

Pilot scope

If there is a fit, we outline the rollout, timeline, and the workflow we would stand up first.

Request a demo

We respond within one business day. A real person reads every request.